Two Scheduling Models: p-Batch Scheduling and
Rescheduling II
Jinjiang Yuan
Department of Mathematics, Zheng Zhou University, Henan 450052,
P.R. China
yuanjj@zzu.edu.cn
Abstract Full Text PDF
In the rescheduling on a single machine, a set of original jobs has
already been scheduled to minimize some cost objective, when a new set
of jobs arrives and creates a disruption. The decision maker needs to insert
the new jobs into the existing schedule without excessively disrupting it.
The existing complexity results and open problems will be reviewed. Specially,
a polynomial-time algorithm for the problem
,
will be reported in detail, where
means that the maximum
sequence disruption of the original jobs is limited to at most k.